View Single Post
gidzzz's Avatar
Posts: 282 | Thanked: 2,387 times | Joined on Sep 2011
#187
Are you 100% sure it is caused by the CSSU update? There is a problem with the attached file, namely some entries have a malformed date, e.g. "20160711T235200Z0" (should be "20160711T235200Z"), which on my setup (still using an older version of calendar-backend) leads to only the first 30 entries being imported (31st is the first with a bad date), of which the last one is on 2016-07-04.

Try with the attached file, I fixed the dates.
Attached Files
File Type: zip Mondphasen_2016-2020_fixed.ics.zip (10.9 KB, 304 views)
__________________
My Thumb mini-repository: http://gidzzz.mooo.com/maemo/.
 

The Following 3 Users Say Thank You to gidzzz For This Useful Post: