Active Topics

 



Notices


Reply
Thread Tools
Posts: 2 | Thanked: 0 times | Joined on Feb 2008
#1
A couple of weeks ago I successfully configured GPE calendar to synch with my Google calendar by adding the ical address into the GPE config on my N800. . . it worked just fine. .

Now, suddenly, I get an unable to resolve hostname error!

Anybody else have the same issue or know how to resolve it??
 
Posts: 97 | Thanked: 3 times | Joined on Jan 2008
#2
No problems with syncing today via erminig....
Frank
__________________
-----------------------------------------------------
Terrorism is not the answer
-----------------------------------------------------
 
sondjata's Avatar
Posts: 1,076 | Thanked: 176 times | Joined on Mar 2007
#3
seconding erminig
 
Posts: 148 | Thanked: 4 times | Joined on May 2006
#4
Is there single-click install for Erminig? At all?
 
sondjata's Avatar
Posts: 1,076 | Thanked: 176 times | Joined on Mar 2007
#5
Yep. Check the software section.
 
Posts: 148 | Thanked: 4 times | Joined on May 2006
#6
Thanks for the tip but I can't find the install file. There must be good reason for this. It would be nice to have that simple click and install file for Erminig. Maybe it's not meant to be easy to install, who knows.
 
Posts: 152 | Thanked: 32 times | Joined on Dec 2007 @ CA
#7
Mine works from just can not post to google calendar.
 
polossatik's Avatar
Posts: 126 | Thanked: 23 times | Joined on Jan 2008
#8
Originally Posted by markku View Post
Is there single-click install for Erminig? At all?
I installed GPE from http://cobb.uk.net/NokiaIT/index.html#gpe (everything except starling and in the order listed there)
Then installed python 2.5 (make sure the application manager is closed) : http://pymaemo.garage.maemo.org/installation.html
and then Erminig ; http://david.hautbois.free.fr/joomla...d=46&Itemid=46

works 100% for me

Last edited by polossatik; 2008-02-14 at 00:58.
 
Posts: 5 | Thanked: 0 times | Joined on Feb 2008
#9
Everything installed OK
Once you lauch Erminig, set google parameter and which GPE calendar you want to sync it with. I click update and then..... and then....
After a while try to close Erminig, "Erminig doesn't respond, do you want to close?"
retried 3-4 time always the same except the last time I did let it go for more than an hour and at the end it was still not responding but I saw some synching between GPE and Google but it was full of double entries.

Something I'm doing wrong?
As I write this I'm not finish with reading the "debug .TXT" and I don't know what I'm looking for either...

For those who use Erminig and it works fine do you let run in backgroud always? Does it respond if you want to close it?
In GPE do you set the calendar to : publish, subscribe or local
to use with Erminig?

Thank you
nic
 
Posts: 4,556 | Thanked: 1,624 times | Joined on Dec 2007
#10
Can't help you with your problem (no idea). But I just load Erminig and click update when I have some Google Events to update.

In GPE I just left the default calendar (local), then in Erminig you can pick the GPE calendar you want to use, and then it'll load the google events in there, and read from there for what events to add to google calendar.
__________________
Originally Posted by ysss View Post
They're maemo and MeeGo...

"Meamo!" sounds like what Zorro would say to catherine zeta jones... after she slaps him for looking at her dirtily...
 

The Following User Says Thank You to Laughing Man For This Useful Post:
Reply


 
Forum Jump


All times are GMT. The time now is 06:47.