Mine works both within the GPE and on google whichever I change both will get updated. It did take me about 10 hrs of reading, trying everything, re-flashing a few times....Worry I might have to research all over again when a new OS comes out
Mine works both within the GPE and on google whichever I change both will get updated. It did take me about 10 hrs of reading, trying everything, re-flashing a few times....Worry I might have to research all over again when a new OS comes out
Can you elaborate on how you got it to work in both directions? I have it working down but not back up to google.
I've got Outlook - Google Calendar Sync - Google Calendar - Erminig - GPE Calendar sync working OK (not tested other way yet). I do have one issue though; If I put a 1:00pm appointment into Outlook, it ends up as 12:00pm in GPE Cal.
Appointment gets to Google cal as correct time and time is correct on N810.
Can you elaborate on how you got it to work in both directions? I have it working down but not back up to google.
As I said, I did so many items (various program installs) that I do not know which was the "winner' or if it was all of them that in total got it to work....
I install Gene's, everything on his webpage, calendar and removed all but the Info on Tap. The last item I install was the Personal menu and soon after that I saw that the up load to igoogle was now working as only the down load was previously.
I used to have it working, but then had a prbolem with it. Ended up having to remove it all. Before I try again, anyone know if there is gonig to be attempt at Google Contact Sync. now that Google have released the APIs.
I didnot have the starting problem either, and all was well with my outlook 2 google 2 gpe (via erminig) until I added a us holidays calendar from icalshare.com into outlook.
It appears there is an erminig issue with how it imports the data from google.
Holidays are correct in outlook, and google - but my GPE has memorial day on saturday 5/31 (not the 26th), and fathers day on 6/19 (not on 6/15) and the like. Odd thing - Flag day 6/14 is correct...
I didnot have the starting problem either, and all was well with my outlook 2 google 2 gpe (via erminig) until I added a us holidays calendar from icalshare.com into outlook.
It appears there is an erminig issue with how it imports the data from google.
Holidays are correct in outlook, and google - but my GPE has memorial day on saturday 5/31 (not the 26th), and fathers day on 6/19 (not on 6/15) and the like. Odd thing - Flag day 6/14 is correct...